GS

Xiongan Utility Tunnel Prefab Construction Camp Project

Located within the core construction area of the Xiongan New Area Start-up Zone, the Utility Tunnel Project 03, as a key urban underground infrastructure project, places higher demands on the standardization, efficiency, and safety management of the construction site.

To meet the on-site office and personnel accommodation needs during the project construction period, this project includes the construction of 250 detachable prefab houses, creating a high-standard modular construction camp.

As a prefab building solutions provider, GS Housing offers professional and systematic prefab containers products and prefab camp solutions for such large-scale infrastructure projects.

I. Project Overview
Project Name: Xiong’an New Area Start-up Zone Utility Tunnel Section 03 Prefab Camp Building

Product Type: Detachable Prefab House

Quantity: 250 sets

Application Functions:

Worker Dormitory

Project Office Area

Meeting Room

Public Supporting Facilities

This project site camp adopts a modular combined-structure design with a scientifically zoned overall layout, meeting the standards for civilized construction management in modern large-scale municipal engineering projects.

II. Core Advantages of GS Housing Prefabricated Houses

1. Standardized Modular Design

GS Housing prefabricated houses adopt a unified, standardized production system, with all components prefabricated in the factory:

✔Hot-dip galvanized steel structure frame

✔Insulated wall panel system

✔Integrated doors, windows, and electrical systems

✔Waterproof roof structure

On-site installation only requires hoisting and assembly for immediate use, significantly shortening the construction cycle.

2. High-strength Steel Structure System

The mainframe uses a high-strength galvanized steel structure, possessing

✔ Strong wind resistance

✔ Class 8 seismic performance

✔ Three-layer stacking ensures safety and stability

✔ Can be repeatedly disassembled and reused

Especially suitable for the long-term and phased use needs of large-scale infrastructure projects.

3. Rapid Installation & Rapid Delivery

250 prefabricated modular units, produced through standardized manufacturing and large-scale transportation, achieve the following:

✔Bulk Delivery

✔Rapid On-site Assembly

✔Modular Combination and Expansion

Compared to traditional temporary construction methods, construction efficiency is significantly improved, greatly meeting the high-paced construction needs of Xiong’an New Area.

4. Flexible Combination & Overall Camp Planning Capabilities

GS Housing provides not only individual prefabricated container products but also

✔Overall Prefabricated Camp Planning and Design

✔Site Office and Living Area Zoning Solutions

✔Multi-story Stacked Building Design

✔Supporting Staircase and Corridor Systems

Achieving a truly comprehensive “standardized construction camp solution.”

III. Applicable Engineering Fields

This product model is widely applicable to:

Urban Integrated Utility Tunnel Projects

Highway and Railway Construction

Energy and Power Projects

Oil and Gas Projects

Large-Scale EPC General Contracting Projects

Overseas Infrastructure Camp Projects

GS Housing has mature application experience in both domestic and international infrastructure construction camps.

Scroll to Top